Conduct Parallel Testing

Conduct Parallel Testing

Up one level
Diagram of Sub-process
Name: Notification of Parallel Run Availability
Object notes: This is an email to the NCEP Centers that the parallel run data is available for evaluation.  The location and configuration of the parallel runs should be noted. Name: Objective Verification of Parallel Runs
Object notes: This documents the objective verification results of the parallel runs. Name: Parallel Run Configuration
Object notes: This documents the configuration of the parallel model runs.  This should log problems and changes to the code which were made during the testing. Name: Developer Name: Developer Name: Parallel Test Summary Name: Setup Parallel Runs Name: Run Parallel Name: Perform Objective Analysis Name: Summarize Verification Results Name: Developer Name: Developer Name: GRIB Files Name: Data Available Name: Make Data Available Name: Send out Notification of Parallel Data Availability Name: NCO NCB Analyst Name: Developer's Branch Chief Name: Create Scripts to Make GEMPAK Files Name: GEMPAK Files Name: NCO CDB Analyst Name: Work Element Name: Responsibility Name: Output Name: Input Name: Responsibility Name: Output Name: Output Name: Input Name: Input Name: Responsibility Name: Output Name: Responsibility Name: Output Name: Output Name: Input Name: Output Name: Input Name: Input Name: Responsibility Name: Responsibility Name: Input Name: Input Name: Input Name: Output Name: Input Name: Responsibility Name: Subjective Verification of Parallel Runs
Object notes: This documents the benifits and risks associated with the implementation from a forecasters perspective at the centers. Name: Perform Subjective Verification [Conduct Parallel Testing]


 Process Model Summary


Occurrence modified: 04/24/2003 10:35:58
Object modified: 02/26/2003 15:47:33