Production Resource & Schedule Impact Analysis Package

Production Resource & Schedule Impact Analysis Package

Up one level
Diagram of Work Product Structure
Name: Parallel Run Results
Object notes: The objective of this analysis is to describe what was encountered computationally during the parallel runs. Name: Analysis of Production Schedule Impact
Object notes: This analysis shows the impact to the production schedule once the optimal timings have been obtained.  This is important because in some cases the change in the runtime of the model may not have a linear impact on the entire model suite.  This analysis also provides a broad pass/fail indication of whether the model will fit in its time window. Name: Model Timing Test Results
Object notes: This document describes how long the model runs against certain types of resources.  It should show we verified the node use chosen to meet the runtime is the most efficient solution computationally. Name: Simple Connection Name: Simple Connection [Production Resource & Schedule Impact Analysis Package]

Work Product Structure Properties


Note: This package validates whether the implementation is stable enough computationally and that it fits into its specified production time window.


 Process Model Summary


Occurrence modified: 01/08/2003 00:30:31
Object modified: 01/26/2003 15:26:40

This document was created using Process Sourcerer ® .
Process Sourcerer is a registered trademark of Electronic Data Systems Corporation.