Analysis of Production Resources & Schedule

Analysis of Production Resources & Schedule

Up one level
Diagram of Sub-process
Name: Perform Parallel Run Tests Name: Perform Timing/Scaling Tests on Jobs Name: Analyze Model Resource Use and Timings Against Schedule Name: Model Timing Test Results
Object notes: This document describes how long the model runs against certain types of resources.  It should show we verified the node use chosen to meet the runtime is the most efficient solution computationally. Name: Parallel Run Results
Object notes: The objective of this analysis is to describe what was encountered computationally during the parallel runs. Name: Analysis of Production Schedule Impact
Object notes: This analysis shows the impact to the production schedule once the optimal timings have been obtained.  This is important because in some cases the change in the runtime of the model may not have a linear impact on the entire model suite.  This analysis also provides a broad pass/fail indication of whether the model will fit in its time window. Name: Failures in Parallel Name: Fits into Production Name: Timings Match Estimates Name: Optimize Code Name: Fix Code Bugs Name: Developer Name: Developer Name: NCO PMB Analyst Name: NCO PMB Analyst Name: NCO PMB Analyst Name: Perform Overall Analysis of Production Resource & Schedule Impact Name: NCO PMB Analyst Name: Analysis of Production Resource & Schedule Impact
Object notes: This analysis should list the risks production reliablity or resources if the implementation were to move forward. Name: Output Name: Input Name: Conditional Flow Name: Conditional Flow Name: Output Name: Input Name: Conditional Flow Name: Conditional Flow Name: Output Name: Input Name: Conditional Flow Name: Conditional Flow Name: Conditional Flow Name: Conditional Flow Name: Conditional Flow Name: Flow Name: Responsibility Name: Responsibility Name: Responsibility Name: Responsibility Name: Responsibility Name: Conditional Flow Name: Conditional Flow Name: Input Name: Input Name: Input Name: Input Name: Input Name: Input Name: Input Name: Responsibility Name: Output Name: Flow Name: Flow [Analysis of Production Resources & Schedule]


 Process Model Summary


Occurrence modified: 01/08/2003 00:39:38
Object modified: 02/26/2003 15:49:22

This document was created using Process Sourcerer ® .
Process Sourcerer is a registered trademark of Electronic Data Systems Corporation.