|
NCEP Home > NCEP Central Operations > Data Management and Quality Assessment Branch > Quality Assessment Project > RAOB Thanks Reports > TPARC Stations Thanks Reports
TPARC Stations Raob "Thanks" Report for Jan. 12, 2009, 08:45 UTC
Printer Friendly Version
TPARC Stations Raob "Thanks" Report for Jan. 12, 2009, 08:45 UTC
Previous TPARC Stations Raob "Thanks" Reports
NCEP UPPER AIR RECEIPT MESSAGE FOR 20090112 06 UTC:
TIME OF EXECUTION Mon Jan 12 8:45:00 UTC 2009
This webpage is updated every 30 min from 1:45 to 3:15 after 00 06 12 and 18 UTC.
20674 ABc 21824 AB 21946 THKS 23330 THKS 23955 THKS 24125 THKS
24266 THKS 24343 AB 24641 24688 THKS 24726 THKS 24944 THKS
24959 25123 25400 25428 ABc 25913 28275 ABc
28698 29231 THKS 29572 29612 29634 THKS 29839
29862 30054 THKS 30554 THKS 30758 AB 31004 31369
31538 AB 31736 AB 31770 31873 31977 32389
32540
Group A (TTAA); Group B (TTBB [and PPBB]); Group C (TTCC, TTDD, [and PPDD]).
[Some stations report no PPBB/PPDD but report sig wind data in TTBB/TTDD.]
THKS means all required parts were in at this time with sufficient data. THANKS!
A capital letter means all required parts had data at this time for that group.
A small letter means reports received but some part had no data for the group.
A space means one or more required parts were missing from the group.
This message measures NCEP data receipt and reflects total system throughput.
Please retransmit missing reports, but DO NOT MAKE NUMEROUS RETRANSMISSIONS.
Check SDM and Gateway administrative messages for news on any comms problems.
Reference the "Thanks" Criteria for further details.
|