|
NCEP Home > NCEP Central Operations > Systems Integration Branch > Quality Assessment Project > RAOB Thanks Reports > USA (NWS) Thanks Reports
USA (NWS) RAOB "Thanks" Report
Printer Friendly Version
Current USA (NWS) RAOB "Thanks" Report
Corresponding USA (other) RAOB "Thanks" Report
Corresponding Latin America RAOB "Thanks" Report
Corresponding Canada RAOB "Thanks" Report
Previous USA (NWS) RAOB "Thanks" Reports
NCEP UPPER AIR RECEIPT MESSAGE FOR 20120214 12 UTC:
TIME OF EXECUTION Tue Feb 14 12:45:19 UTC 2012
THIS WEBPAGE IS UPDATED EVERY 15 MINUTES FROM 0:45 to 2:00 AFTER 00 and 12 UTC.
DO NOT CONTACT the SDM if your data did not post here.
70026 THKS 70133 THKS 70200 AB 70219 THKS 70231 THKS 70261 THKS
70273 THKS 70308 THKS 70316 THKS 70326 THKS 70350 THKS 70361 THKS
70398 AB 72201 72202 AB 72206 AB 72208 AB 72210 AB
72214 AB 72215 ABc 72230 AB 72233 AB 72235 AB 72240 AB
72248 AB 72249 AB 72250 THKS 72251 AB 72261 THKS 72265 AB
72274 ABc 72293 AB 72305 THKS 72317 THKS 72318 AB 72327 AB
72340 THKS 72357 AB 72363 AB 72364 AB 72365 THKS 72376 AB
72388 AB 72402 AB 72403 AB 72426 AB 72440 AB 72451 AB
72456 AB 72469 THKS 72476 THKS 72489 AB 72493 THKS 72501 AB
72518 AB 72520 AB 72528 AB 72558 THKS 72562 THKS 72572 THKS
72582 AB 72597 AB 72632 AB 72634 AB 72645 AB 72649 AB
72659 AB 72662 ABc 72672 AB 72681 AB 72694 A 72712 AB
72747 AB 72764 AB 72768 THKS 72776 THKS 72786 THKS 72797 THKS
74389 AB 74455 AB 74494 AB 74560 AB 78526 AB 91165 AB
91212 AB 91285 AB 91334 AB 91348 THKS 91376 AB 91408 AB
91413 AB 91765 abc
Group A (TTAA); Group B (TTBB [and PPBB]); Group C (TTCC, TTDD, [and PPDD]).
[Some stations report no PPBB/PPDD but report sig wind data in TTBB/TTDD.]
THKS means all required parts were in at this time with sufficient data. THANKS!
A capital letter means all required parts had data at this time for that group.
A small letter means reports received but some part had no data for the group.
A space means one or more required parts were missing from the group.
This message measures NCEP data receipt and reflects total system throughput.
Please retransmit missing reports, but DO NOT MAKE NUMEROUS RETRANSMISSIONS.
Check SDM and Gateway administrative messages for news on any comms problems.
Reference the "Thanks" Criteria for further details.
|