NCEP CCS Conversion Guide |
Snow/Frost System Overview |
Back to Main Page |
Snow/Frost Configuration
The CCS computer for this phase of the acquisition consists of two seperate POWER4 Clusters (SPs) called Snow and Frost. Each cluster contains 22 Regatta Servers. The servers are tied together with two colony switch planes. The first two Regatta servers on each system are reserved for interactive use, GPFS Servers and LoadLeveler Class 1 batch processing. The remaining servers are compute servers. Each Regatta server is divided into 8 logical partitions (LPARs). Each systems therefore has 640 CPUs for compute and 64 CPUs for interactive, GPFS and Class1 batch use. Each system has 14 TBytes of its own GPFS disk. NFS is served up by two HACMP servers outside of each cluster.
Off the Shelf Regatta Server Characteristics
Combinations of Different Sized LPARs Permitted | |
# of Partitions | CPUs per Partition |
1 | 32 |
2 | 16 |
4 | 8 |
8 | 4 |
16 | 2 |
Back to Main Page |