Skip Navigation Links weather.gov 
NOAA logo - Click to go to the NOAA homepage National Weather Service   NWS logo - Click to go to the NWS homepage
National Centers for Environmental Prediction
Navigation Bar Left Cap
Navigation Bar End Cap

NCEP - Upcoming Changes
NCEP Home > NCO Home > Production Management Branch > Changes

  PAGE UPDATED:  05/20/2008

2008 -  CHANGES TO NCEP MODELS
2008 - IMPLEMENTATION DATES TO NOAAPORT

CCS
IMPLEMENTATION
DATE
DESCRIPTION OF CHANGE NOAAPORT (NP)
DISSEMINATION
DATE OR ALREADY ON NOAAPORT
(ON NP) OR N/A IF DATA IS NOT SENT TO NP
NWS TINS/
INFORMATIONAL
BRIEFINGS
12/19/2007-
01/06/2008
MORATORIUM FOR HOLIDAYS
N/A
N/A
01/14/2008
CFS (Climate Forecast System)/GODAS UPGRADE (Deep water assimilation).
Changes:
Extend the GODAS assimilation to 2175 meters
Correct a temperature bias in the global intermediate waters
Reduce the 8-day lag in the initial conditions to a 1-day lag for both ocean and atmosphere.
Introduce 2 new members out to 9 months.
Expected Benefits:
1. Improve the CPC week 2 and US Hazards assessments forecast
2. Improve spread in monthly forecasts
3. Correct temperature bias in global intermediate waters
4. Improve the week 3-6 monthly forecast
N/A
CFS INFO
NWS TIN
01/28/2008 REMOVAL OF MANY GRIB1 PRODUCTS ON NWS/NCEP FTP SERVERS
ftp.ncep.noaa.gov
tgftp.nws.noaa.gov
N/A NWS TIN
NCEP INFO PAGE
03/04/2008 NWW3 (GLOBAL High Resolution) - Extend Northern boundary from 78N to 90N in support of AK Region. See 11/27/2007 upgrade below.
OB 9.0 NWS TIN #1
NWS TIN #2
03/08/2008
NAM DNG (SMART INIT) - Create post processed high resolution grids for CONUS/AK/HI/PR domains which will provide smart initialization capability for GFE in AWIPS. These data sets are only destined for NOAAPORT in support of the NWS field offices.
CONUS =  5 KM; AK = 6 KM; HI/PR = 2.5 KM
OB 8.3 EMC OUTPUT
03/31/2008 NAM - General model changes/upgrades. See TIN.
No change to NP products NWS TIN #1
NWS TIN #2
NWS TIN #3
03/31/2008 NWW3 (WAVE) - Great Lakes Wave model implementation. (Based on NAM initialization)
AWIPS OB 9.0 NWS TIN
04/15/2008 RTMA (ALASKA) - Implement Alaskan domain. OB 8.3
NP - 01/19/2008
EMC OUTPUT
NWS TIN #1
NWS TIN #2
N/A
RTMA (HAWAII) - Implement Hawaii (HI) domain. AWIPS OB 9.0
NP - 07/2008


N/A RTMA (PUERTO RICO) - Implement Puerto Rico (PR) domain. AWIPS OB 9.0
NP - 07/2008

06/24/2008 WAVE ENSEMBLE - General model changes/upgrades. See TIN.
N/A NWS TIN
08/05/2008 HIRES - General model changes/upgrades. See TIN.
AWIPS OB 9.0
NP - 06/2008
NWS TIN
 
2007 -  CHANGES TO NCEP MODELS
2007 - IMPLEMENTATION DATES TO NOAAPORT 

CCS
IMPLEMENTATION
DATE
DESCRIPTION OF CHANGE
NOAAPORT (NP)
DISSEMINATION
DATE OR ALREADY ON
(ON) OR N/A IF DATA IS NOT SENT TO NP
NWS TINS/
INFORMATIONAL
BRIEFINGS
10/01/2006-
01/01/2007
MORATORIUM on all upgrades while transistion to next NCEP Central Computing System (CCS) occurs.
N/A
N/A
02/13/2007
Deletion of Several Legacy Fax Charts.
N/A
NWS TIN
08/08/2006
NAM SIMULATED REFLECTIVITY PRODUCTS
02/2007

03/27/2007
GEFS UPGRADE.  New members sent to ftpprd.ncep.noaa.gov and tgftp.nws.noaa.gov in grib2 format only.
N/A
NWS TIN
03/27/2007
GODAS UPGRADE.  Include JASON satellite data.
N/A
GODAS INFO
JASON INFO
06/06/2006 SREF SYSTEM ENSEMBLE PRODUCTS

04/2007 NWS TIN
05/01/2007
GFS UPGRADE. 

05/01/2007 NWS TIN
EMC parallel run info
GFS History File Info
08/22/2006
1/12 DEGREE GLOBAL SST ANALYSIS
06/01/2007
NWS Change Notice
06/05/2007
RTOFS UGRADE.
N/A
NWS TIN
08/22/2006
GFS BUFR SOUNDINGS
06/05/2007
NWS TIN
06/12/2007 PROBABLISITIC STORM SURGE OB 8.3 NWS TIN
06/19/2007
HURRICANE WRF MODEL
WRF/NMM based model. GFDL in parallel operations for 2007.
N/A
NWS TIN
06/26/2007 RTMA UPGRADE - US DOMAIN
Improve the accuracy of the experimental RTMA by implementing improved quality control processing, improved uncertainty estimations and logic to better fit observations.
06/26/2007
09/05/2007 COFS MODEL REMOVED FROM PRODUCTION. Replaced by RTOFS. N/A
NWS TIN
09/11/2007 HIRES UPGRADE.
Update model codes to the latest, supported version of the WRF (2.2).
Increase WRF-NMM resolution from 5.2 to 4.0 km.  Increase WRF-ARW resolution from 5.8 to 5.1 km.  Reconfigure three existing CONUS domains into two larger domains runs twice per day.
OB 9.0
HIRES INFO
09/18/2007 AIR QUALITY UPGRADE - Domain expansion (3x to 5x) N/A
NWS TIN
09/25/2007 GFS UPGRADE - Unified post processor. 09/25/2007 NWS TIN
NCEP Change Notice-10/10/2007
09/25/2007 NAEFS/TIGGE PRODUCT CHANGE
Add new products to the NAEFS (GEFS) operational product stream to support the THORPEX TIGGE project.
N/A

6/28/2005 RUC 13 KM (including BEST CAPE/CIN and model topography)  11/04/2007 NWS TIN-05/23/2005
NWS TIN-03/31/2006
NWS TIN-09/14/2007
WMO IDS
11/27/2007 NOAA WAVE WATCH III UPGRADE.
The new multi-grid wave model will eventually replace the Alaskan (AKW), Western North Atlantic (WNA) and Eastern North Pacific (ENP) wave models. 
All present GRIB and bulletin data from these models will be produced from the new model. 
The Global NWW3 model will be replaced by this model at a later date.

Expected Benefits: Model structure will be used to introduce higher resolution products to the field in the future and will allow for future enhancements to coastal applications.
No change to current NP products.

OB 9.0 - New High Resolution Products
NWS TIN-08/17/2007
NWS TIN-08/18/2007
NWS TIN-09/27/2007
NCEP Change Notice-10/12/2007
NWS TIN-11/14/2007
12/4/2007
GSI (Gridpoint Statistical Interpolation) UPGRADE -
Changes:
1. Modify GSI code to permit assimilation of SBUV-8 and JMA wind data.
2. Upgrade to latest version of GSI.
Expected Benefits:
1. Incremental improvement due to addition of new data types.
N/A
GSI INFO
12/4/2007
NAEFS/TIGGE UPGRADE
Changes:
1. GFS deterministic model bias corrected (bc) output through F180
2. GFS bc output used in GEFS processing
3. Combine NCEP/GEFS (20 member) and CMC/GEFS (20 member)  to produce: Ensemble mean and anomaly, ensemble spread and mode along with 10%,50%,90% probability forecast at 1x1 degree resolution.
4. Statistical downscaling by using RTMA as a reference:
a. At NDGD (5km) resolution (CONUS), generate mean and mode along with 10%, 50% and 90% probability forecast
N/A
NAEFS INFO
TIGGE INFO
NCEP Change Notice-10/12/2007
NWS TIN-10/24/2007
12/12/2007 SREF UPGRADE - Bias correction for all fields, except QPF, and add Alaska domain for RSM component. No change to NP
products.
NCEP Change Notice-10/24/2007
Bias Corrected Fields
NWS TIN-11/09/2007

FY2006 IMPLEMENTATIONS ON CCS AND NOAAPORT

DATE
CHANGE
NOTICES
03/07/2006
06/18 UTC NAM start time delayed 25 minutes
IMPLEMENTED ON CCS.
NWS Change Notice (MS-Word)
03/28/2006
10 Member Wave Model Ensembles
IMPLEMENTED ON CCS.

04/19/2006
NCEP operational and non-operational ftp services
split apart.  IMPLEMENTED.
NCEP Change Notice (HTML)
05/09/2006 NAM BUFR soundings to 84 hours.
IMPLEMENTED ON CCS.
NWS Change Request (MS-Word)
NWS Change Notice (MS-Word)
05/30/2006
NAEFS (Global Ensembles) -
MAJOR PRODUCT OVERHAUL
IMPLEMENTED ON CCS.
NCEP FTP Server Change Notice (HTML)
NWS FTP Server Change Notice (HTML)
06/06/2006

SREF system ensemble products to NOAAPORT
(Data sent to NWS/TOC ... not yet routed to NOAAPORT)
IMPLEMENTED ON CCS.
NWS Change Request-Grid 212
NWS Change Request-Grid 216
NWS Change Request-Grid 243
NWS Change Notice (MS-Word)
06/06/2006
Deletion of Several Legacy Fax Charts
IMPLEMENTED ON CCS.
NWS Change Notice (MS-Word)
06/20/2006 NAM/Eta replaced with NAM/NMM in WRF framework
Postponed to June 20, 2006 due to Critical Weather
IMPLEMENTED ON CCS.
NWS Change Notice (MS-Word)
NCEP Change Notice (HTML)
06/27/2006
SREF - Increase from 2 to 4 runs per day
IMPLEMENTED ON CCS.

07/11/2006 13km RUC 2006 Spring Bundle
IMPLEMENTED ON CCS.

08/08/2006
GFS BUFR Soundings to NOAAPORT
IMPLEMENTED ON CCS.
(Data sent to NWS/TOC ... not yet routed to NOAAPORT)
NWS Change Request (MS-Word)
NWS Change Notice (MS-Word)
List of parameters contained in these data
Sample Data
08/08/2006
1/12 degree global SST analysis to NOAAPORT
IMPLEMENTED ON CCS.
(Data sent to NWS/TOC ... not yet routed to NOAAPORT)
NWS Change Request (MS-Word)
NWS Change Notice (MS-Word)
Sample Data
08/08/2006 NAM Simulated Reflectivity products to NOAAPORT
IMPLEMENTED ON CCS.
(Data sent to NWS/TOC, not yet routed to NOAAPORT)
NWS Change Request (MS-Word)
NWS Change Notice (MS-Word)
Sample Data
08/22/2006 Real Time Mesosacle Analysis (5 km CONUS) to AWIPS
IMPLEMENTED ON CCS.
NWS Change Request (MS-Word)
NWS Change Notice (MS-Word)
08/22/2006 GFS - Hybrid sigma-pressure level implementation
IMPLEMENTED ON CCS.
NWS Change Notice (MS-Word)
08/22/2006 Great Lakes wave model
IMPLEMENTED ON CCS.

12/19/2006
NAM - WRF - NDAS - DGEX Crisis change
IMPLEMENTED ON CCS.
NWS Technical Information Notice



NOAA/ National Weather Service
National Centers for Environmental Prediction
5200 Auth Road
Camp Springs, Maryland 20746
NCEP Internet Services Team
Disclaimer
Credits
Glossary
Privacy Policy
About Us
Career Opportunities
Page last modified: Tuesday, 20-May-2008 21:14:45 GMT